{"id":6100,"date":"2021-08-04T09:00:08","date_gmt":"2021-08-04T12:00:08","guid":{"rendered":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/?p=6100"},"modified":"2021-08-04T09:04:23","modified_gmt":"2021-08-04T12:04:23","slug":"utilizacao-de-geotextil-bidim-em-aterro-sobre-solo-mole-e-drenagem-sub-superficial-campos-eliseos-duque-de-caxias-rj","status":"publish","type":"post","link":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/utilizacao-de-geotextil-bidim-em-aterro-sobre-solo-mole-e-drenagem-sub-superficial-campos-eliseos-duque-de-caxias-rj\/","title":{"rendered":"UTILIZA\u00c7\u00c3O DE GEOT\u00caXTIL BIDIM EM ATERRO SOBRE SOLO MOLE E DRENAGEM SUB-SUPERFICIAL CAMPOS EL\u00cdSEOS, DUQUE DE CAXIAS RJ"},"content":{"rendered":"\n<p><strong><span style=\"color:#434343\" class=\"has-inline-color\">Autor:<\/span><\/strong> Departamento T\u00e9cnico &#8211; Atividade Bidim<\/p>\n\n\n\n<h3><span style=\"color:#434343\" class=\"has-inline-color\">INTRODU\u00c7\u00c3O<\/span><\/h3>\n\n\n\n<p>A constru\u00e7\u00e3o do anel vi\u00e1rio do Distrito Industrial de El\u00edseos no Munic\u00edpio de Duque de Caxias-RJ se divide em 02 trechos, onde boa parte da obra a ser executada \u00e9 sobre terreno com baixa capacidade de suporte (solo mole).<\/p>\n\n\n\n<p>O projeto do Trecho 1 foi desenvolvido atrav\u00e9s de Parceria P\u00fablico Privada (PPP) resultando em uma obra com custo estimado de R$ 80 milh\u00f5es. A solu\u00e7\u00e3o contemplada na execu\u00e7\u00e3o do aterro no Trecho 1 foi: execu\u00e7\u00e3o da limpeza da superf\u00edcie local, remo\u00e7\u00e3o de 80 cm de espessura de solo mole, lan\u00e7amento do rach\u00e3o com aproximadamente 50 cm.<\/p>\n\n\n\n<p>Ap\u00f3s a execu\u00e7\u00e3o do rach\u00e3o aplicou-se o geot\u00eaxtil Bidim RT-16 e acima dele uma camada de areia de 30 cm de espessura. Ap\u00f3s a compacta\u00e7\u00e3o da areia o projetista especificou uma camada de geogrelha com resist\u00eancia a tra\u00e7\u00e3o de 400 kN\/m para trabalhar como refor\u00e7o de base do pavimento sendo lan\u00e7ado sobre ela 1,00 m de solo compactado em camadas de 20 cm para posterior lan\u00e7amento de sub-base e base para a execu\u00e7\u00e3o do pavimento asf\u00e1ltico em CBUQ (Concreto Betuminoso Usinado a Quente).<\/p>\n\n\n\n<h3><span style=\"color:#434343\" class=\"has-inline-color\">DADOS GERAIS<\/span><\/h3>\n\n\n\n<p>Assunto<\/p>\n\n\n\n<p>Utiliza\u00e7\u00e3o de geot\u00eaxtil Bidim em aterro sobre solo mole e drenagem subsuperficial.<\/p>\n\n\n\n<p>Local<\/p>\n\n\n\n<p>&nbsp;El\u00edseos, Munic\u00edpio de Duque de Caxias RJ.<\/p>\n\n\n\n<h4>Descri\u00e7\u00e3o do problema<\/h4>\n\n\n\n<p>Constru\u00e7\u00e3o do Trecho 1 do anel vi\u00e1rio do Distrito Industrial de El\u00edseos sobre terreno com baixa capacidade de suporte.<\/p>\n\n\n\n<h4>Solu\u00e7\u00e3o do problema<\/h4>\n\n\n\n<p>Utiliza\u00e7\u00e3o de geot\u00eaxtil Bidim RT-16 em uma camada, como elemento de separa\u00e7\u00e3o e elemento de refor\u00e7o e drenagem longitudinal ao longo da pista, de forma a evitar a ruptura de solo mole.<\/p>\n\n\n\n<p>Vantagens da solu\u00e7\u00e3o Rapidez de execu\u00e7\u00e3o e custo baixo quando comparada as demais alternativas.<\/p>\n\n\n\n<h4>Quantidade<\/h4>\n\n\n\n<p>2.150 m\u00b2 de Manta Geot\u00eaxtil Bidim RT-10.<\/p>\n\n\n\n<p>7.095 m\u00b2 de Manta Geot\u00eaxtil Bidim RT-16.<\/p>\n\n\n\n<p>Data de execu\u00e7\u00e3o<\/p>\n\n\n\n<p>Setembro de 2005 a fevereiro de 2006.<\/p>\n\n\n\n<p>Projetista<\/p>\n\n\n\n<p>Natrontec Estu e Engenharia de Processos Ltda.<\/p>\n\n\n\n<p>Construtora<\/p>\n\n\n\n<p>Procontex Projetos e Constru\u00e7\u00f5es Ltda.<\/p>\n\n\n\n<h4>Propriet\u00e1rio<\/h4>\n\n\n\n<p>Parceria P\u00fablico-Privada, envolvendo:<\/p>\n\n\n\n<p>Rio Pol\u00edmeros S\/A,<\/p>\n\n\n\n<p>Governo do Estado do Rio de Janeiro,<\/p>\n\n\n\n<p>Prefeitura Municipal de Duque de Caxias e Assecampe (Associa\u00e7\u00e3o das Empresas de El\u00edseos).<\/p>\n\n\n\n<h3><span style=\"color:#434343\" class=\"has-inline-color\">DESCRI\u00c7\u00c3O DOS GEOSSINT\u00c9TICOS UTILIZADOS<\/span><\/h3>\n\n\n\n<h4>Manta Geot\u00eaxtil Bidim RT-10<\/h4>\n\n\n\n<p>MANTA GEOT\u00caXTIL N\u00c3OTECIDO, 100% POLI\u00c9STER COM RESIST\u00caNCIA TRA\u00c7\u00c3O LONGITUDINAL M\u00cdNIMA DE 10 KN\/M E TRA\u00c7\u00c3O TRANSVERSAL M\u00cdNIMA DE 09 KN\/M<\/p>\n\n\n\n<h4>Manta Geot\u00eaxtil Bidim RT-16<\/h4>\n\n\n\n<p>MANTA GEOT\u00caXTIL N\u00c3OTECIDO, 100% POLI\u00c9STER COM RESIST\u00caNCIA TRA\u00c7\u00c3O LONGITUDINAL M\u00cdNIMA DE 16 KN\/M E TRA\u00c7\u00c3O TRANSVERSAL M\u00cdNIMA DE 14 KN\/M<\/p>\n\n\n\n<h3 class=\"has-text-align-center\"><span style=\"color:#434343\" class=\"has-inline-color\">DOCUMENTA\u00c7\u00c3O FOTOGR\u00c1FICA<\/span><\/h3>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"406\" height=\"302\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-184.png\" alt=\"\" class=\"wp-image-6103\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-184.png 406w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-184-300x223.png 300w\" sizes=\"(max-width: 406px) 100vw, 406px\" \/><figcaption>Parceria P\u00fablico-Privada entre os governos municipal, estadual e empresa privada.<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"404\" height=\"302\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-186.png\" alt=\"\" class=\"wp-image-6106\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-186.png 404w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-186-300x224.png 300w\" sizes=\"(max-width: 404px) 100vw, 404px\" \/><figcaption>Vista geral do terreno.<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"226\" height=\"300\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-187.png\" alt=\"\" class=\"wp-image-6107\"\/><figcaption>Solo mole com presen\u00e7a de muita \u00e1gua.<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"406\" height=\"302\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-189.png\" alt=\"\" class=\"wp-image-6109\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-189.png 406w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-189-300x223.png 300w\" sizes=\"(max-width: 406px) 100vw, 406px\" \/><figcaption>Detalhe na execu\u00e7\u00e3o drenos laterais com geot\u00eaxtil Bidim RT-10.<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"226\" height=\"301\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-190.png\" alt=\"\" class=\"wp-image-6110\"\/><figcaption>Detalhe do fechamento do dreno.<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"406\" height=\"303\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-192.png\" alt=\"\" class=\"wp-image-6112\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-192.png 406w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-192-300x224.png 300w\" sizes=\"(max-width: 406px) 100vw, 406px\" \/><figcaption>Execu\u00e7\u00e3o da camada de rach\u00e3o.<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"406\" height=\"302\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-194.png\" alt=\"\" class=\"wp-image-6114\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-194.png 406w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-194-300x223.png 300w\" sizes=\"(max-width: 406px) 100vw, 406px\" \/><figcaption>Aplica\u00e7\u00e3o do geot\u00eaxtil Bidim RT-16 sobre a camada de rach\u00e3o.<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"406\" height=\"302\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-195.png\" alt=\"\" class=\"wp-image-6115\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-195.png 406w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-195-300x223.png 300w\" sizes=\"(max-width: 406px) 100vw, 406px\" \/><figcaption>Vista geral da obra.<br>Lan\u00e7amento da areia sobre o geot\u00eaxtil Bidim.<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"406\" height=\"302\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-197.png\" alt=\"\" class=\"wp-image-6118\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-197.png 406w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-197-300x223.png 300w\" sizes=\"(max-width: 406px) 100vw, 406px\" \/><figcaption>Execu\u00e7\u00e3o da camada de areia sobre o geot\u00eaxtil Bidim RT-16.<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"406\" height=\"302\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-199.png\" alt=\"\" class=\"wp-image-6121\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-199.png 406w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/08\/image-199-300x223.png 300w\" sizes=\"(max-width: 406px) 100vw, 406px\" \/><figcaption>Base finalizada aguardando a execu\u00e7\u00e3o do revestimento.<\/figcaption><\/figure><\/div>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Autor: Departamento T\u00e9cnico &#8211; Atividade Bidim INTRODU\u00c7\u00c3O A constru\u00e7\u00e3o do anel vi\u00e1rio do Distrito Industrial de El\u00edseos no Munic\u00edpio de Duque de Caxias-RJ se divide em 02 trechos, onde boa parte da obra a ser executada \u00e9 sobre terreno com baixa capacidade de suporte (solo mole). O projeto do Trecho 1 foi desenvolvido atrav\u00e9s de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[52,53],"tags":[58],"_links":{"self":[{"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/posts\/6100"}],"collection":[{"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/comments?post=6100"}],"version-history":[{"count":7,"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/posts\/6100\/revisions"}],"predecessor-version":[{"id":6124,"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/posts\/6100\/revisions\/6124"}],"wp:attachment":[{"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/media?parent=6100"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/categories?post=6100"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/tags?post=6100"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}