{"id":4815,"date":"2021-07-20T11:22:03","date_gmt":"2021-07-20T14:22:03","guid":{"rendered":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/?p=4815"},"modified":"2021-07-20T11:39:36","modified_gmt":"2021-07-20T14:39:36","slug":"4815-2","status":"publish","type":"post","link":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/4815-2\/","title":{"rendered":"UTILIZA\u00c7\u00c3O DE GEOT\u00caXTIL BIDIM EM ATERRO SOBRE SOLO MOLE CURITIBA PR"},"content":{"rendered":"\n<p><strong><span style=\"color:#434343\" class=\"has-inline-color\">Autor:<\/span><\/strong> Departamento T\u00e9cnico &#8211; Atividade Bidim<\/p>\n\n\n\n<p><span style=\"color:#434343\" class=\"has-inline-color\"><strong>Distribuidor:<\/strong> <\/span>Diprotec Produtos T\u00e9cnicos para Constru\u00e7\u00e3o Ltda.<\/p>\n\n\n\n<h3><span style=\"color:#434343\" class=\"has-inline-color\">DADOS GERAIS<\/span><\/h3>\n\n\n\n<p>Assunto<\/p>\n\n\n\n<p>Utiliza\u00e7\u00e3o de Bidim em aterro sobre solo mole<\/p>\n\n\n\n<p>Local<\/p>\n\n\n\n<p>Curitiba PR<\/p>\n\n\n\n<p>Descri\u00e7\u00e3o do problema<\/p>\n\n\n\n<p>Execu\u00e7\u00e3o de shopping center sobre terreno de baixa capacidade de suporte.<\/p>\n\n\n\n<h4>Descri\u00e7\u00e3o da solu\u00e7\u00e3o<\/h4>\n\n\n\n<p>Utiliza\u00e7\u00e3o de Manta Geot\u00eaxtil Bidim RT-14 em duas camadas, como elemento de separa\u00e7\u00e3o e elemento de refor\u00e7o, de forma a evitar a ruptura e garantir a seguran\u00e7a da obra no curto e no longo prazo (fase de opera\u00e7\u00e3o).<\/p>\n\n\n\n<h4>Vantagens da solu\u00e7\u00e3o<\/h4>\n\n\n\n<p>Rapidez de execu\u00e7\u00e3o, facilidade construtiva, custo relativamente baixo comparado com alternativas, tais como troca de solo, drenos verticais, estaqueamento e bermas de equil\u00edbrio.<\/p>\n\n\n\n<p>Quantidade<\/p>\n\n\n\n<p>25.000m\u00b2 de Manta Geot\u00eaxtil Bidim RT-14<\/p>\n\n\n\n<p>Data de execu\u00e7\u00e3o<\/p>\n\n\n\n<p>Setembro a dezembro de 2003<\/p>\n\n\n\n<p>Propriet\u00e1rio<\/p>\n\n\n\n<p>Multishopping<\/p>\n\n\n\n<p>Projetista<\/p>\n\n\n\n<p>EngePlan<\/p>\n\n\n\n<p>Construtora<\/p>\n\n\n\n<p>J. Malucelli<\/p>\n\n\n\n<h3><span style=\"color:#434343\" class=\"has-inline-color\">DESCRI\u00c7\u00c3O DOS GEOSSINT\u00c9TICOS UTILIZADOS<\/span><\/h3>\n\n\n\n<p>Manta Geot\u00eaxtil Bidim RT-14<\/p>\n\n\n\n<p>MANTA GEOT\u00caXTIL N\u00c3OTECIDO 100% POLI\u00c9STER COM RESIST\u00caNCIA TRA\u00c7\u00c3O LONGITUDINAL M\u00cdNIMA DE 14 KN\/M E TRA\u00c7\u00c3O TRANSVERSAL M\u00cdNIMA DE KN\/M<\/p>\n\n\n\n<h3><span style=\"color:#434343\" class=\"has-inline-color\">DESENHO ESQUEM\u00c1TICO<\/span><\/h3>\n\n\n\n<p>A constru\u00e7\u00e3o do Multishopping em Curitiba foi executada sobre um solo de baixa capacidade de suporte. Sendo que este solo n\u00e3o aguentaria a solicita\u00e7\u00e3o de carga gerada pelo peso do pr\u00e9dio, podendo vir a romper ap\u00f3s a sua execu\u00e7\u00e3o. A solu\u00e7\u00e3o encontrada foi a aplica\u00e7\u00e3o de duas camadas de Manta Geot\u00eaxtil <strong><em>Bidim <\/em><\/strong>RT-14 como elemento de refor\u00e7o, elemento separador e de drenagem entre o solo mole e o solo de refor\u00e7o.<\/p>\n\n\n\n<p>Os transpasses entre as mantas foram costurar, garantindo assim o bom desempenho da solu\u00e7\u00e3o em todas as dire\u00e7\u00f5es de solicita\u00e7\u00e3o, tanto longitudinais como transversais a manta.<\/p>\n\n\n\n<p>A execu\u00e7\u00e3o do aterro se deu pelo m\u00e9todo da cunha, sendo que, primeiramente a superf\u00edcie foi totalmente limpada, sendo exclu\u00ed materiais pontiaguda, ap\u00f3s a limpeza do solo, aplicou-se a primeira camada de Bidim e acima desta uma camada de 50cm de areia. Ap\u00f3s a compacta\u00e7\u00e3o desta areia, aplicou-se a segunda camada de Bidim e acima desta uma camada de 70cm de solo compactado, para depois se executar o piso do shopping.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"512\" height=\"209\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1236.png\" alt=\"\" class=\"wp-image-4821\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1236.png 512w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1236-300x122.png 300w\" sizes=\"(max-width: 512px) 100vw, 512px\" \/><\/figure><\/div>\n\n\n\n<h3 class=\"has-text-align-center\"><span style=\"color:#434343\" class=\"has-inline-color\">DOCUMENTA\u00c7\u00c3O FOTOGR\u00c1FICA<\/span><\/h3>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"405\" height=\"302\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1238.png\" alt=\"\" class=\"wp-image-4823\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1238.png 405w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1238-300x224.png 300w\" sizes=\"(max-width: 405px) 100vw, 405px\" \/><figcaption>Execu\u00e7\u00e3o da primeira camada de Manta Geot\u00eaxtil Bidim RT-14.<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img loading=\"lazy\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1240.png\" alt=\"\" class=\"wp-image-4825\" width=\"404\" height=\"301\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1240.png 405w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1240-300x224.png 300w\" sizes=\"(max-width: 404px) 100vw, 404px\" \/><figcaption>Execu\u00e7\u00e3o da primeira camada de areia.<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"405\" height=\"302\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1242.png\" alt=\"\" class=\"wp-image-4827\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1242.png 405w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1242-300x224.png 300w\" sizes=\"(max-width: 405px) 100vw, 405px\" \/><figcaption>Vista Geral da obra.<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"404\" height=\"302\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1243.png\" alt=\"\" class=\"wp-image-4828\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1243.png 404w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1243-300x224.png 300w\" sizes=\"(max-width: 404px) 100vw, 404px\" \/><figcaption>Execu\u00e7\u00e3o da segunda camada de Manta Geot\u00eaxtil Bidim RT-14.<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"404\" height=\"302\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1245.png\" alt=\"\" class=\"wp-image-4830\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1245.png 404w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1245-300x224.png 300w\" sizes=\"(max-width: 404px) 100vw, 404px\" \/><figcaption>Vista geral do terreno.<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"404\" height=\"302\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1247.png\" alt=\"\" class=\"wp-image-4832\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1247.png 404w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1247-300x224.png 300w\" sizes=\"(max-width: 404px) 100vw, 404px\" \/><figcaption>Execu\u00e7\u00e3o da costura.<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"404\" height=\"302\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1248.png\" alt=\"\" class=\"wp-image-4833\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1248.png 404w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-1248-300x224.png 300w\" sizes=\"(max-width: 404px) 100vw, 404px\" \/><figcaption>Drenagem com Manta Geot\u00eaxtil Bidim RT-14 e rach\u00e3o.<\/figcaption><\/figure><\/div>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Autor: Departamento T\u00e9cnico &#8211; Atividade Bidim Distribuidor: Diprotec Produtos T\u00e9cnicos para Constru\u00e7\u00e3o Ltda. DADOS GERAIS Assunto Utiliza\u00e7\u00e3o de Bidim em aterro sobre solo mole Local Curitiba PR Descri\u00e7\u00e3o do problema Execu\u00e7\u00e3o de shopping center sobre terreno de baixa capacidade de suporte. Descri\u00e7\u00e3o da solu\u00e7\u00e3o Utiliza\u00e7\u00e3o de Manta Geot\u00eaxtil Bidim RT-14 em duas camadas, como elemento [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[54],"tags":[76],"_links":{"self":[{"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/posts\/4815"}],"collection":[{"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/comments?post=4815"}],"version-history":[{"count":8,"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/posts\/4815\/revisions"}],"predecessor-version":[{"id":4837,"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/posts\/4815\/revisions\/4837"}],"wp:attachment":[{"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/media?parent=4815"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/categories?post=4815"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/tags?post=4815"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}