{"id":4275,"date":"2021-07-14T10:33:02","date_gmt":"2021-07-14T13:33:02","guid":{"rendered":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/?p=4275"},"modified":"2021-07-14T10:45:10","modified_gmt":"2021-07-14T13:45:10","slug":"aplicacao-do-geotextil-bidim-em-sistema-de-drenagem-do-centro-de-manutencao-de-cavaleiro-jaboatao-dos-guararapes-pe","status":"publish","type":"post","link":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/aplicacao-do-geotextil-bidim-em-sistema-de-drenagem-do-centro-de-manutencao-de-cavaleiro-jaboatao-dos-guararapes-pe\/","title":{"rendered":"APLICA\u00c7\u00c3O DO GEOT\u00caXTIL BIDIM EM SISTEMA DE DRENAGEM DO CENTRO DE MANUTEN\u00c7\u00c3O DE CAVALEIRO JABOAT\u00c3O DOS GUARARAPES PE"},"content":{"rendered":"\n<p id=\"block-4ec88a36-52aa-4d23-8053-38fa6f341afc\" style=\"font-size:11px\"><strong><br><br><span style=\"color:#434343\" class=\"has-inline-color\">Autor:<\/span><\/strong>&nbsp;Departamento T\u00e9cnico \u2013 Atividade Bidim<\/p>\n\n\n\n<p id=\"block-db192e87-bf45-4bfb-849a-c737e636970b\" style=\"font-size:11px\">Revisado JANEIRO 2011- Departamento T\u00e9cnico Mexichem Bidim Ltda.<\/p>\n\n\n\n<h3><span style=\"color:#434343\" class=\"has-inline-color\">INTRODU\u00c7\u00c3O<\/span><\/h3>\n\n\n\n<p>Este trabalho relata a aplica\u00e7\u00e3o do geot\u00eaxtil Bidim (n\u00e3otecido agulhado, filamentos cont\u00ednuos, 100% poli\u00e9ster) no dreno profundo na constru\u00e7\u00e3o da Infraestrutura e Postea\u00e7\u00e3o da Linha de Teste do Centro de Manuten\u00e7\u00e3o de Cavaleiro, situada no munic\u00edpio do Jaboat\u00e3o Guararapes PE, com uma extens\u00e3o de 1,20 km.<\/p>\n\n\n\n<p>O projeto foi elaborado pela consultora Maia Melo Engenharia Ltda., tendo com supervis\u00e3o a Ger\u00eancia de Projeto do Metr\u00f4 do Recife. As obras est\u00e3o sendo executadas pela construtora Pl\u00ednio Cavalcanti &amp; Cia Ltda.<\/p>\n\n\n\n<p>A constru\u00e7\u00e3o teve in\u00edcio no dia 03 de novembro de 1997 e a previs\u00e3o para conclus\u00e3o ser\u00e1 para o m\u00eas de agosto de 1998. O consumo previsto de geot\u00eaxtil Bidim RT-21 \u00e9 da ordem de 7.200 m\u00b2.<\/p>\n\n\n\n<h3><span style=\"color:#434343\" class=\"has-inline-color\">CONSIDERA\u00c7\u00d5ES GERAIS<\/span><\/h3>\n\n\n\n<p>Situada no bairro de Cavaleiro no Munic\u00edpio do Jaboat\u00e3o Guararapes, esta obra visa principalmente a manuten\u00e7\u00e3o e testes Trens de Unidade El\u00e9trica TUE, uma vez que estes servi\u00e7os s\u00e3o executa ap\u00f3s a paralisa\u00e7\u00e3o da opera\u00e7\u00e3o da linha comercial, ou seja, ap\u00f3s a zero hora. Uma vez constru\u00edda esta linha a manuten\u00e7\u00e3o e testes Trens de Unidade El\u00e9trica podem ser feitas em qualquer hor\u00e1rio acarretando assim menos custos nas manuten\u00e7\u00f5es.<\/p>\n\n\n\n<p>Tamb\u00e9m esta obra \u00e9 de grande import\u00e2ncia para o metr\u00f4 de Recife, pois est\u00e1 previsto para o m\u00eas de setembro o in\u00edcio das obras de amplia\u00e7\u00e3o do metr\u00f4. Este projeto prev\u00ea a constru\u00e7\u00e3o de 20 km de trilhos e dez novas esta\u00e7\u00f5es. Nosso metro, que hoje atende a 130 mil passageiros por dia, de Recife a Jaboat\u00e3o Guararapes, passar\u00e1 a servir tamb\u00e9m a popula\u00e7\u00e3o de Camaragibe, transportando 360 mil passageiros por dia.<\/p>\n\n\n\n<p>A localiza\u00e7\u00e3o da obra, inclusive linhas amplia\u00e7\u00e3o das linhas pode ser vista na Figura 1.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" width=\"564\" height=\"681\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-839.png\" alt=\"\" class=\"wp-image-4277\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-839.png 564w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-839-248x300.png 248w\" sizes=\"(max-width: 564px) 100vw, 564px\" \/><\/figure>\n\n\n\n<h3><span style=\"color:#434343\" class=\"has-inline-color\">APLICA\u00c7\u00c3O DO GEOT\u00caXTIL BIDIM<\/span><\/h3>\n\n\n\n<p>O geot\u00eaxtil Bidim foi adotado como filtro do sistema de drenagem profunda por permitir um r\u00e1pido escoamento e, ao mesmo tempo, evitar o carreamento de part\u00edculas para o interior do dreno estabilizando o solo adjacente.<\/p>\n\n\n\n<p>Em fun\u00e7\u00e3o das caracter\u00edsticas da obra foi escolhido o geot\u00eaxtil Bidim RT-21, baseado em suas propriedades mec\u00e2nicas, hidr\u00e1ulicas e f\u00edsicas. O geot\u00eaxtil Bidim dispensa os c\u00e1lculos granulom\u00e9tricos necess\u00e1rios e f\u00f3rmulas para c\u00e1lculos de vaz\u00f5es al\u00e9m de ser um material cont\u00ednuo, imputresc\u00edvel e de caracter\u00edsticas constantes. A Figura 2 apresenta um desenho esquem\u00e1tico da se\u00e7\u00e3o transversal do dreno executado.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"1024\" height=\"895\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/Imagem1-17-1024x895.png\" alt=\"\" class=\"wp-image-4279\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/Imagem1-17-1024x895.png 1024w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/Imagem1-17-300x262.png 300w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/Imagem1-17-768x671.png 768w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/Imagem1-17-1536x1343.png 1536w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/Imagem1-17.png 2033w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/div>\n\n\n\n<p>Figura 2 &#8211; Desenho esquem\u00e1tico da se\u00e7\u00e3o transversal do dreno.<\/p>\n\n\n\n<h3 class=\"has-text-align-center\"><span style=\"color:#434343\" class=\"has-inline-color\">DOCUMENTA\u00c7\u00c3O FOTOGR\u00c1FICA<\/span><\/h3>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"475\" height=\"301\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-841.png\" alt=\"\" class=\"wp-image-4282\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-841.png 475w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-841-300x190.png 300w\" sizes=\"(max-width: 475px) 100vw, 475px\" \/><figcaption>Local de estocagem do geot\u00eaxtil Bidim.<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"495\" height=\"302\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-843.png\" alt=\"\" class=\"wp-image-4284\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-843.png 495w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-843-300x183.png 300w\" sizes=\"(max-width: 495px) 100vw, 495px\" \/><figcaption>Trincheira drenante com parte executada e parte<br>a executar.<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"474\" height=\"300\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-845.png\" alt=\"\" class=\"wp-image-4286\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-845.png 474w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-845-300x190.png 300w\" sizes=\"(max-width: 474px) 100vw, 474px\" \/><figcaption>Detalhe do dreno executado.<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"471\" height=\"302\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-847.png\" alt=\"\" class=\"wp-image-4288\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-847.png 471w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-847-300x192.png 300w\" sizes=\"(max-width: 471px) 100vw, 471px\" \/><figcaption>Detalhe da caixa com tubo poroso.<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"201\" height=\"303\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-849.png\" alt=\"\" class=\"wp-image-4290\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-849.png 201w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-849-199x300.png 199w\" sizes=\"(max-width: 201px) 100vw, 201px\" \/><figcaption>Vista drenos executa nas duas laterais da obra.<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" width=\"488\" height=\"303\" src=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-850.png\" alt=\"\" class=\"wp-image-4291\" srcset=\"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-850.png 488w, https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-content\/uploads\/2021\/07\/image-850-300x186.png 300w\" sizes=\"(max-width: 488px) 100vw, 488px\" \/><figcaption>Vista geral do trecho com drenos executa.<\/figcaption><\/figure><\/div>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Autor:&nbsp;Departamento T\u00e9cnico \u2013 Atividade Bidim Revisado JANEIRO 2011- Departamento T\u00e9cnico Mexichem Bidim Ltda. INTRODU\u00c7\u00c3O Este trabalho relata a aplica\u00e7\u00e3o do geot\u00eaxtil Bidim (n\u00e3otecido agulhado, filamentos cont\u00ednuos, 100% poli\u00e9ster) no dreno profundo na constru\u00e7\u00e3o da Infraestrutura e Postea\u00e7\u00e3o da Linha de Teste do Centro de Manuten\u00e7\u00e3o de Cavaleiro, situada no munic\u00edpio do Jaboat\u00e3o Guararapes PE, com [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[52],"tags":[58],"_links":{"self":[{"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/posts\/4275"}],"collection":[{"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/comments?post=4275"}],"version-history":[{"count":5,"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/posts\/4275\/revisions"}],"predecessor-version":[{"id":4293,"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/posts\/4275\/revisions\/4293"}],"wp:attachment":[{"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/media?parent=4275"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/categories?post=4275"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/diprotecgeo.com.br\/casos-de-obra\/wp-json\/wp\/v2\/tags?post=4275"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}